Estimating the Return on GenAI Projects in Enterprise Fraud Management, Part 3 of 3: The Decision

Where Parts 1 and 2 left off

Part 1 built the value model. Detection projects are valued as avoided loss, net of the recovery you were getting anyway, minus the operating cost of the extra alerts and the customer friction they create. Efficiency projects are valued as released hours, converted to dollars only through a savings realization rate η with a named mechanism behind it. Running both produces a cross term that must be claimed exactly once.

Part 2 turned the point estimates into ranges. Rare, severe events got a scenario model with severity built up from direct loss, make-whole payments, revenue attrition, and remediation. A Monte Carlo simulation, sampling the detection threshold rather than recall and precision separately, produced percentiles instead of a single figure.

The running example, a retirement recordkeeping platform evaluating a graph-based detection layer and an LLM case-summarization assistant, stands at: detection $5,212,800 net (simulated P10 $2.41M, P90 $8.14M), efficiency $492,200 realized, cross term $148,600, and a tail scenario worth $623,250 a year in expected terms against a bad-day severity that can exceed $27 million.

What is still missing is everything it costs to have these capabilities at all, an honest baseline to compare against, and a way to present the result. That is this article.

Program costs: what it takes to have the capability at all

The operating costs in Part 1 scale with what the system does: more alerts, more hours, more friction. Program costs are different: you pay them to have the thing at all, and they do not move when you adjust the threshold.

Ctotal=I+G+Rhuman+N⋅σ⋅κ+MevalC_{\text{total}} = I + G + R_{\text{human}} + N \cdot \sigma \cdot \kappa + M_{\text{eval}}

  • I = implementation and
    integration
  • G = governance: model
    documentation, validation, ongoing monitoring
  • Rhuman = human review
    of generated output, which as established in Part 1 does not go
    away
  • N · σ · κ =
    inference cost: total events, times the share σ routed to a language model, times
    cost per call
  • Meval = evaluation
    set maintenance

Inference economics: the σ term is important

The inference term is a product with a very large first factor, N, and that makes σ, the fraction of events you send to a language model, one of the most consequential decisions in the project.

For example, take an institution processing 12 million distribution and transfer requests a year, and an LLM call costing $0.40.

  • Send everything (σ = 1):
    $4,800,000 per year. This kills the project.
  • Send only generated alerts (σ ≈ 0.006): about $28,000 per year. This is a rounding
    error.

Same model, same capability, a 170-fold cost difference. The architecture that survives is the one where conventional scoring (rules, gradient boosting, graph features) runs cheaply on everything and the language model is reserved for the narrow top of the funnel where its reasoning actually changes an outcome.

Write a per-alert token cap into the design, not into the backlog. Unbounded language model invocation against a retail-scale event stream is a well-documented way for these projects to die in month nine, when the first full-quarter cloud bill arrives.

Baseline against internal build, not against nothing

At a firm of this size, the alternative to buying something is almost never doing nothing. It is your own platform team building a version of it in three quarters.

That means the honest numerator is marginal:

Vmarginal=V⋅Δm12+(Vvendor−Vinternal)−I−MvendorV_{\text{marginal}} = V \cdot \frac{\Delta m}{12} + \big( V_{\text{vendor}} – V_{\text{internal}} \big) – I – M_{\text{vendor}}
  • V · Δm/12 =
    the annual benefit, scaled by how many months earlier you get it. This
    is usually the dominant term.
  • Vvendor − Vinternal = the performance difference between what
    you would buy and what your team would build. Often small, sometimes
    negative, occasionally decisive.
  • I = integration cost
  • Mvendor = ongoing
    vendor management, due diligence, and contract overhead

The timing term carries most cases at this tier, and the right move is to say so plainly. Be aware it cuts both ways: measured returns on capability investments lag deployment because the complementary process and training changes take time, so a strict year-one framing understates the benefit [1]. If you dress a timing argument up as a capability argument, an internal engineering group that knows its own roadmap will take the case apart in the review meeting, and they will be right to.

Simulate Δm rather than asserting it, using the same machinery as Part 2. Internal roadmaps slip in one direction only, and a right-skewed distribution on delivery timing often widens the case in your favor while making it more defensible, not less.

The running example, part three: rolling up

Everything the series has computed for the recordkeeping platform, in one table. Point estimates from Part 1, simulated ranges from Part 2, program costs from this article.

LinePoint estimateSimulated P10Simulated P90
Class A net$5,212,800$2,410,000$8,140,000
Class B (realized)$492,200$268,500$716,000
Cross term (realized)$148,600n/an/a
Tail scenario$623,250$180,000$1,420,000
Gross annual benefit$6,476,850$2,930,000$9,780,000
Implementation, year one($1,200,000)
Run and support($600,000)
Governance and validation($350,000)
Inference, alerts only($28,400)
Year-one net$4,298,450$752,000$7,600,000

Probability of a negative year-one outcome: 3.8%.

The Class B range comes from the realization-rate sensitivity table rather than the simulation: $268,500 with internal staff only and no headcount action, $492,200 in the base case of BPO renewal plus partial hire deferral, $716,000 with full BPO conversion at renewal.

Presenting the result

Three things to say when this table goes in front of a committee.

Lead with the P10, not the P50. The P10 is the outcome you would beat in nine years out of ten. A project that clears its costs in nine years out of ten is a different proposition from one with an attractive average, and the committee will trust you more for having said so.

Report the probability of a negative outcome. That single number (here, 3.8%) does more work in an investment committee than the rest of the analysis, because it answers the question people are actually asking, which is not “how much will we make” but “how likely is this to embarrass me.”

Name the architectural decision hiding in the cost lines. The inference line is small only because of a design choice. Had every event been routed to a language model, that line reads $4.8 million and the project does not clear. A committee that understands the cost is contingent on the architecture will hold the project to that architecture, which is exactly what you want.

Closing

The framework reduces to six moves.

Sort projects into detection and efficiency, because they have different value equations and different measurement problems. Handle the moving baseline with shadow scoring, staggered rollout, or a bounded holdout, depending on what your institution will tolerate. Discount efficiency savings by an explicit savings realization rate, and name the mechanism that converts hours to dollars. Model tail events by scenario rather than by frequency, and build severity up to include the revenue attrition that usually dominates it. Simulate the parts that are genuinely uncertain, respecting the correlations, especially the one between recall and precision, and use a plain sensitivity table for the parts you could simply go and look up. Baseline the whole thing against what your own engineers would build, because that, not the status quo, is your real alternative.

None of this produces certainty. It produces a number with its assumptions on the outside, where they can be argued with. In fraud, that is the best available outcome, and it is considerably better than the confident figure that falls apart in the second meeting.

References

[1] Brynjolfsson, E., Rock, D., & Syverson, C. (2021). “The Productivity J-Curve: How Intangibles Complement General Purpose Technologies.” American Economic Journal: Macroeconomics 13(1).